We are a global operator of essential infrastructure
Here you can find all the audio and video materials we produce regarding the different events and projects that Redeia undertakes. This audio-visual information, which can de downloaded, includes, when necessary, links and supplementary documentation.
The electricity interconnection between the Spanish peninsula and the Balearic Islands is a project which is key to ensuring and improving the reliability of the electricity supply of the Balearic system given its unique nature.
Due to the presence of the exhibition "A highway behind the socket" in the Science Museum of Valladolid, Red Eléctrica launched an educational program.
In Spain we have the world's first centre that controls renewable energy generation.
This interconnection will reinforce the security of both electricity systems and will favour the integration of a greater volume of renewable energy, especially wind power energy coming from the Iberian system.
At the precise instance in which we turn on the light, a power station must generate the energy required to meet that need.
The REMO Project, the electricity interconnection between Spain and Morocco, commenced in 1997 with the installation of the first electricity line and concluded with the commissioning of a second line in June 2006.
Since its founding in 1985, Red Eléctrica's activity has been guided by one clear principle: to provide the electricity system and the public with a service of the highest quality and efficiency.
In 2002 the enlargement works of Madrid's Barajas airport began, the new T-4 terminal and two new runways. Said infrastructures were affected by the fact that a part of the 400 kV line (double circuit San Sebastián de los Reyes-Loeches-Morata).
Red Eléctrica, since its founding, has sought to continuously improve the availability of the electricity transmission facilities.