The demand for electrical energy grew 6.4% in April

The demand for electrical energy on the Spanish peninsula in the month of April is estimated at 19,926 GWh, a value 6.4% higher than that registered in the same month last year. After factoring in the seasonal and working patterns, electrical energy demand on the Spanish peninsula grew 3% with regard to April 2015.

In the first four months of the year, demand for electrical energy on the Spanish peninsula is estimated at 83,796 GWh, up 0.5% on the same period in 2015. After having factored in the seasonal and working patterns, demand for electrical energy was 0.3% higher than in the same period last year.

Generation coming from wind power in April totaled 4,301 GWh, a value 13.8% higher than the same month last year, and represented 21.9% of total production.

In the month of April, using provisional data available at 29 April, generation coming from renewable energy sources represented 54.1% of production.

79.2% of electricity generation during the month was obtained using technologies which produce zero CO2 emissions.

 

Generation mix in the month of April 2016

Generation mix January to April 2016 

 

The Press Office of Red Eléctrica publishes all written and audio-visual information via the Twitter account @RedElectricaREE.

Also on Facebook through the account RedElectricaREE.